- Helix Resources has identified a new 1,200-meter Induced Polarisation (IP) geophysics anomaly near the Canbelego Main Lode Resource.
- This anomaly, along with two others recently identified, suggests potential to increase the existing copper Mineral Resource.
- A gradient array induced polarisation (GAIP) survey at Canbelego Main Lode identified a highly prospective +1,200m conductive zone extending north of Canbelego coincident with surface copper geochemical anomalism.
- A GAIP survey at the Caballero Prospect identified a 2,400m conductive zone, also coincident with surface copper geochemical anomalism.
- These new geophysics anomalies at Canbelego and Caballero are largely undrilled and are considered very prospective for copper mineralisation.
- Follow-up geophysics will commence next week, with drilling planned to commence in May.
- The Canbelego Main Lode Mineral Resource Estimate (MRE) totals 1,830,000 tonnes at 1.74% Cu, containing 31,842 tonnes of copper metal.
Sentiment
Score: 8
Explanation: The announcement is positive due to the identification of new copper targets and the planned drilling program. The company is actively exploring and expanding its resource base, which is a positive sign for investors.
Highlights
- A new 1,200m IP geophysics anomaly has been identified near the Canbelego Main Lode Resource, indicating potential for resource expansion.
- Three new, undrilled target zones have been identified around the Canbelego Copper Resource through recent geophysical surveys.
- A 2,400m conductive zone was identified at the Caballero Prospect, correlating with surface copper geochemical anomalism.
- Follow-up geophysics will commence next week, with drilling planned to commence in May.
- The Canbelego Main Lode Mineral Resource Estimate (MRE) totals 1,830,000 tonnes at 1.74% Cu, containing 31,842 tonnes of copper metal.
Positives
- Successful application of IP geophysical survey techniques to delineate key zones correlating with known copper anomalism.
- Identification of significant new copper targets in close proximity to known, high-grade copper mineralisation at the Canbelego deposit.
- The new anomalies correlate strongly with surface copper geochemical anomalism, increasing confidence in their prospectivity.
- Drilling is scheduled to start in May to test the anomalies.
- Systematic assessment of the tenement portfolio with innovative methods to make new discoveries.
Risks
- Drilling commencement in May is subject to weather conditions.
- The new geophysics anomalies are largely undrilled, so there is no guarantee that economic copper mineralisation will be found.
- Results pending from the Bijoux copper prospect survey.
Future Outlook
Helix is focused on growing its copper endowment in the Cobar region and is systematically assessing its entire tenement portfolio with innovative methods to make new discoveries, with drilling scheduled to start in May.
Management Comments
- The new geophysical survey results show there are significant new copper targets in close proximity to known, high-grade copper mineralisation at the Canbelego deposit.
- This is generating a lot of excitement in the Helix team on our ability to expand our Canbelego Copper Mineral Resources with drilling scheduled to start in May.
- Helix is strongly focused on growing its copper endowment in the prolific Cobar region and is systematically assessing its entire tenement portfolio with innovative methods to make new discoveries.
- We have high confidence that the conductive zones represent mineralised structures due to the correlation of copper geochemical anomalism at surface with these conductive zones and our new geological modelling.
Industry Context
This announcement is relevant to the copper exploration industry, particularly in the Cobar region of NSW. The use of IP geophysics to identify new targets is a common practice, and the success of Helix's surveys could attract interest from other companies exploring in the area. The joint venture with Aeris Resources is also a common model for sharing risk and expertise in exploration projects.
Comparison to Industry Standards
- The Canbelego Main Lode Mineral Resource Estimate (MRE) totals 1,830,000 tonnes at 1.74% Cu, containing 31,842 tonnes of copper metal.
- Comparable copper projects in Australia, such as Sandfire Resources' DeGrussa mine, have similar grades and tonnages.
- DeGrussa had an initial resource of 10.6Mt at 4.6% Cu.
- Other companies in the Cobar region, such as Peak Gold Mines, also utilize IP geophysics for exploration.
Stakeholder Impact
- Shareholders: Positive impact due to the potential for increased copper resources and future production.
- Employees: Positive impact due to the potential for new job opportunities and career advancement.
- Customers: No immediate impact, but potential for increased copper supply in the future.
- Suppliers: Positive impact due to increased demand for exploration and drilling services.
- Creditors: Positive impact due to the potential for increased revenue and profitability.
Next Steps
- Commence follow-up geophysics over both prospective areas to better define targets.
- Commence drilling in May to test existing and new PDIP chargeable anomalies.
- Complete data processing for the Bijoux GAIP survey in mid-April.
- Plan follow-up PDIP lines after the Bijoux GAIP survey data processing is completed.
Key Dates
- 2024-02-29: Referenced ASX Report regarding previous exploration results.
- 2024-03-04: GAIP survey conducted between 4 and 24 March 2024
- 2024-03-24: GAIP survey conducted between 4 and 24 March 2024
- 2024-04: April 2024 Canbelego orientation GAIP survey
- late-April: Completion of follow-up PDIP lines in the Canbelego-Caballero corridor is expected.
- mid-April: Data processing for the Bijoux GAIP survey is expected to be completed.
- mid-May: Drilling of existing and new PDIP chargeable anomalies is planned to commence.
Keywords
Filings with Classifications
Market Announcement
- The announcement concerns a capital raising by Aeris Resources Limited.
Quarterly Report
- Underground ore production was impacted by delays to stope filling at Budgerygar due to a failure of the newly commissioned paste pump.
- Ramp up to full production at Murrawombie Pit was slower than expected due to the contractor having difficulty securing skilled operators.
Mineral Resource Update
- The document contains better than expected results due to the significant increase in copper and gold resources at the Constellation deposit, with a substantial upgrade to the Indicated Mineral Resource.
Half-Year Results
- The company's financial results for HY25 are significantly better than HY24, with increased revenue, lower costs, and a substantial improvement in profitability.
Quarterly Report
- The ANZ facility was renewed to July 2025 to facilitate the refinancing process.
- The company is working to complete refinancing.
Quarterly Report
- There were delays to the paste fill plant at Budgerygar.
Quarterly Report
- The new paste fill pump and reticulation system at the Budgerygar mine was delayed due to overseas supplier issues.
Annual General Meeting Results
- The AGM approved the issuance of an additional 10% of the issued capital over a 12-month period.
Facility Extension Announcement
- The refinancing process implies the company is seeking additional capital, though the specific method is not detailed.
Quarterly Report
- Tritton and Cracow exceeded production expectations, resulting in better than expected overall production.
- The AISC was lower than expected, indicating better cost management.
Quarterly Operational Report
- The completion of mining activities at Mt Colin is now expected in late November 2024.
Quarterly Operational Report
- Copper equivalent production exceeded expectations, reaching 10.2kt for the quarter.
- All-in sustaining costs (AISC) were lower than anticipated at A$5.32/lb.
Annual Report
- Despite lower overall revenue, Aeris Resources significantly exceeded expectations for Adjusted EBITDA, demonstrating improved operational efficiency and benefiting from higher commodity prices.
Annual General Meeting Notice
- Resolution 3 proposes issuing up to an additional 10% of the issued capital over a 12-month period.
- Funds raised would be used for exploration, assessing investment opportunities, and working capital.
Company Presentation
- Mt Colin's copper production was below guidance due to limited toll processing availability, indicating a delay in processing mined ore.
Quarterly Activities Report
- Mining activities at Mt Colin are now expected to continue until early Q2 FY25, which is later than the previously expected late Q4 FY24.
Presentation
- Delays in toll processing for Mt Colin have resulted in a significant buildup of ore stockpiles.
Missing type for ID: 3564
- ASX:AIS announces worse than expected results.
Missing type for ID: 3564
- ASX:AIS announces better than expected results.
Metallurgical Testwork Results
- The metal recoveries are better than the original conventional flotation flowsheet.
Exploration Update
- The DHEM results suggest that the targeted copper lodes are deeper than initially anticipated, which could increase exploration costs and delay potential production.
Group Mineral Resource and Ore Reserve Statement
- The Jaguar Ore Reserve has not been updated since the previous reporting period (end December 2022).
Group Mineral Resource and Ore Reserve Statement
- The document contains worse than expected results due to the overall decrease in Group Ore Reserve tonnage.
Exploration Update
- The new IP anomaly is larger than the one associated with the existing Canbelego Main Lode, suggesting the potential for a larger copper deposit.
Quarterly Report
- Tritton's metal production was impacted by labour and equipment availability, leading to lower than expected output.
Quarterly Activities Report
- Mt Colin toll processing and copper production are behind schedule.
- Due to reduced processing runs through the year, copper production is forecast to be below guidance for FY24 at Mt Colin.
Exploration Update
- The document contains better than expected results because new geophysical surveys have identified significant new copper targets in close proximity to known, high-grade copper mineralisation at the Canbelego deposit.
Disclaimer: This summary was generated by artificial intelligence and its accuracy is not guaranteed. The information provided here is for general informational purposes only and does not constitute financial advice, recommendation, or endorsement of any kind. It may contain errors or omissions. You should not rely on this information to make financial decisions. Always seek the advice of a qualified financial professional before making any investment or financial decisions. Use of this information is at your own risk.