ASX
190 days, 11 hours ago 
ARU
Arafura Rare Earths LTD
Update to Gas Supply Agreement
Arafura Rare Earths Limited has extended the condition precedent date for its gas supply agreement with the Mereenie field joint venture to February 4, 2025.
Delay expected
 

ASX
190 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
HZN: Arafura Gas Supply Agreement Update
Horizon Oil provides an update on its Arafura Gas Supply Agreement, following a previous announcement in July.

ASX
190 days, 13 hours ago 
ARU
Arafura Rare Earths LTD
ECH: Arafura Gas Supply Agreement Update
Echelon Resources Limited has amended its gas supply agreement with Arafura Rare Earths, extending the condition precedent date to February 4, 2025.
Delay expected
 

ASX
191 days, 1 hours ago 
ARU
Arafura Rare Earths LTD
CTP: Arafura Gas Supply Agreement Update
Central Petroleum extends the deadline for a conditional gas supply agreement with Arafura Resources to February 4, 2025.
Delay expected
 

ASX
200 days, 4 hours ago 
ARU
Arafura Rare Earths LTD
Update on Project Leadership
Arafura Rare Earths Limited appoints Tommie van der Walt as Chief Projects Officer, effective January 20, 2025, while Stuart Macnaughton steps down as Chief Operating Officer.

ASX
207 days, 10 hours ago 
ARU
Arafura Rare Earths LTD
FY24 Sustainability Report
Arafura Rare Earths Limited (ARU) announced over US$1 billion in debt funding for its Nolans Project, highlighting the geostrategic importance of its role in a diversified global supply chain for rare earths essential to green technologies.
Capital raise
 

ASX
250 days, 2 hours ago 
ARU
Arafura Rare Earths LTD
Revised AGM Presentation
Arafura Rare Earths Limited (ASX: ARU) has retracted peer comparisons from its AGM presentation following ASX feedback that the comparisons were not like-for-like, and investors should not rely on those slides when making investment decisions.
Capital raise
 

ASX
254 days, 6 hours ago 
ARU
Arafura Rare Earths LTD
Results of the 2024 Annual General Meeting
Arafura Rare Earths Limited (ASX: ARU) reports that all resolutions put to shareholders at its Annual General Meeting on October 17, 2024, passed.

ASX
254 days, 9 hours ago 
ARU
Arafura Rare Earths LTD
AGM Presentation
Arafura Rare Earths' Nolans project, a fully permitted and construction-ready neodymium-praseodymium (NdPr) rare earth mine in Australia, has secured over US$1 billion in conditional debt financing and is progressing towards finalizing equity funding.
Capital raise
 

ASX
254 days, 9 hours ago 
ARU
Arafura Rare Earths LTD
Chairman's address
Arafura Rare Earths secured over US\$1 billion in debt funding for its Nolans Project, a significant achievement given the challenging market conditions, and is now focused on securing equity funding to reach a final investment decision.
Delay expected
 
Capital raise
 

ASX
261 days, 9 hours ago 
ARU
Arafura Rare Earths LTD
AGM pre-registration link
Arafura Rare Earths Limited (ASX: ARU) announced its Annual General Meeting will be held on October 17, 2024, with shareholders able to participate via teleconference.

ASX
285 days, 4 hours ago 
ARU
Arafura Rare Earths LTD
2024 Annual Report
Arafura Rare Earths Limited secured over US$1 billion in conditional debt funding approvals, marking a significant milestone for its Nolans Project and positioning it as a key player in the ex-China rare earths supply chain.
Capital raise
 

ASX
285 days, 4 hours ago 
ARU
Arafura Rare Earths LTD
Notice of Annual General Meeting Information
Arafura Rare Earths Limited (ASX: ARU) has announced its Annual General Meeting (AGM) will be held on October 17, 2024, in Perth, Australia, with shareholders encouraged to submit questions in advance.

ASX
285 days, 4 hours ago 
ARU
Arafura Rare Earths LTD
Notice of Annual General Meeting/Proxy Form
Arafura Rare Earths Limited will hold its 2024 Annual General Meeting on October 17, 2024, to consider resolutions including the adoption of the remuneration report, election of new directors, appointment of an auditor, and ratification of a previous securities issue.
Capital raise
 

ASX
290 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Arafura Share Purchase Plan results
Arafura Rare Earths Limited (ASX: ARU) successfully raised $4.6 million through its Share Purchase Plan (SPP), exceeding expectations and strengthening its financial position for the Nolan's project.
Worse than expected
 
Capital raise
 

ASX
291 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Ian Murray appointed as Non-Executive Director
Arafura Rare Earths Limited announced the appointment of Ian Murray as a Non-Executive Director, effective September 10, 2024, bringing extensive financial and operational experience to support the company's growth.

ASX
295 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Completion of Tranche 2 Placement
Arafura Rare Earths Limited (ASX: ARU) successfully completed Tranche 2 of its A$20 million placement, raising A$5.8 million through the issuance of 36,268,000 new shares.
Capital raise
 

ASX
297 days, 7 hours ago 
ARU
Arafura Rare Earths LTD
Results of General Meeting
Arafura Rare Earths Limited (ASX: ARU) successfully passed all resolutions put to shareholders at its general meeting on September 4, 2024, including the ratification of previous share issues and the issuance of shares under placement tranches and a share purchase plan.
Capital raise
 

ASX
330 days, 4 hours ago 
ARU
Arafura Rare Earths LTD
Notice of General Meeting/Proxy Form
Arafura Rare Earths Limited is seeking shareholder approval for the ratification and issue of shares related to a recent placement and share purchase plan at a General Meeting on September 4, 2024.

ASX
330 days, 4 hours ago 
ARU
Arafura Rare Earths LTD
Despatch of SPP and Notice of Meeting
Arafura Rare Earths Limited announces the opening of a Share Purchase Plan (SPP) to raise A$7 million and the dispatch of a notice of meeting for an extraordinary general meeting to be held on September 4, 2024.
Capital raise
 

ASX
330 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Share Purchase Plan Prospectus
Arafura Rare Earths Limited is offering eligible shareholders the opportunity to participate in a Share Purchase Plan (SPP) to raise up to $7 million, with potential oversubscriptions of $3 million, to advance the company's funding initiatives.
Capital raise
 

ASX
334 days, 11 hours ago 
ARU
Arafura Rare Earths LTD
HZN: New Gas Sales Agreements
Horizon Oil's Mereenie joint venture secures long-term gas sales agreements, contracting forecast production until the end of 2030 and reducing reliance on the Northern Gas Pipeline.
Delay expected
 

ASX
334 days, 11 hours ago 
ARU
Arafura Rare Earths LTD
CUE: Cue signs six-year Gas Sales Agreements with NT Gov
Cue Energy Resources has secured six-year gas sales agreements with the Northern Territory Government for gas supply from the Mereenie and Palm Valley fields, ensuring energy security and facilitating further investment.
Delay expected
 

ASX
334 days, 11 hours ago 
ARU
Arafura Rare Earths LTD
CTP: New Gas Sale Agreements
Central Petroleum secures new long-term gas sale agreements following a successful Expression of Interest (EOI) process, enhancing revenue certainty and supporting future investments.
Delay expected
 
Capital raise
 

ASX
334 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Gas supply agreement with Mereenie JV Partners updated
Arafura Rare Earths has updated its gas supply agreement with the Mereenie JV partners for its Nolans Project, securing up to 16.44 petajoules of natural gas and gaining flexibility in delivery timing.

ASX
337 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Retirement of Non-Executive Director
Chris Tonkin resigns from Arafura Rare Earths' Board after 13 years, following the successful debt placement for the Nolans Project.

ASX
338 days, 10 hours ago 
ARU
Arafura Rare Earths LTD
Completion of A$20m institutional placement
Arafura Rare Earths Limited successfully completes a fully underwritten A$20 million institutional placement and announces a Share Purchase Plan (SPP) targeting an additional A$7 million.

ASX
339 days, 6 hours ago 
ARU
Arafura Rare Earths LTD
Arafura launches A$20m placement and A$7m SPP
Arafura Rare Earths launches a fully underwritten A$20 million placement and a A$7 million share purchase plan to advance the Nolans Project.

ASX
339 days, 11 hours ago 
ARU
Arafura Rare Earths LTD
Trading Halt
Arafura Rare Earths Ltd (ARU) has requested a trading halt pending an announcement regarding the completion of a placement component of a capital raising.
Capital raise
 

ASX
340 days, 9 hours ago 
ARU
Arafura Rare Earths LTD
Quarterly Activities Report and Appendix 5B
Arafura Rare Earths secures conditional approval for over US$1 billion in debt funding for the Nolans Project, marking a significant step towards a final investment decision.
Capital raise
 

ASX
340 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Arafura achieves major debt funding milestone
Arafura Rare Earths secures conditional credit approvals for US$775 million in senior debt funding for the Nolans Project, marking a significant step towards a final investment decision.
Delay expected
 
Capital raise
 

ASX
340 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Arafura achieves major debt funding milestone presentation
Arafura Rare Earths secures over US$1 billion in debt and completion support, marking a key milestone in its debt-led funding strategy for the Nolans Project.
Delay expected
 
Capital raise
 

ASX
359 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Arafura confirms German ECA support with Euler Hermes
Arafura Rare Earths secures conditional approval for up to US$115 million in untied loan guarantees from Euler Hermes, marking a significant step in its debt-led strategy for the Nolans Project.

ASX
362 days, 8 hours ago 
ARU
Arafura Rare Earths LTD
Conditional approval for up to US$150m from KEXIM
Arafura Rare Earths secures conditional approval for up to US$150 million in debt financing from The Export-Import Bank of Korea (KEXIM) for the Nolans Project, strengthening ties with Korea and advancing the project towards a final investment decision.

ASX
395 days, 9 hours ago 
ARU
Arafura Rare Earths LTD
Critical Minerals Conference Presentation
Arafura Rare Earths Limited presents its Nolans Project at the 2024 Australian Critical Minerals Conference, highlighting its construction readiness, funding progress, and strategic importance in the NdPr supply chain.
Capital raise
 

ASX
397 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
EDC provides conditional approval for US$300m debt facility
Arafura Rare Earths secures conditional approval for a US$300 million debt facility from Export Development Canada (EDC) for the Nolans Project, marking a significant step towards a final investment decision.

ASX
422 days, 9 hours ago 
ARU
Arafura Rare Earths LTD
Change of Auditor
Arafura Rare Earths Limited announces the appointment of BDO Audit Pty Ltd as its new auditor following the resignation and restructuring of BDO Audit (WA) Pty Ltd.

ASX
425 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Quarterly Activities Report and Appendix 5B
Arafura Rare Earths secures US$533 million in government support, advances Nolans Project funding, and focuses on strategic partnerships amid NdPr market fluctuations.
Capital raise
 

ASX
431 days, 7 hours ago 
ARU
Arafura Rare Earths LTD
Date of Quarterly Report and Briefing
Arafura Rare Earths Ltd will release its Quarterly Report for the period ended 31 March 2024 on Monday 29 April 2024.

ASX
432 days, 3 hours ago 
ARU
Arafura Rare Earths LTD
Rare Earths Conference Presentation
Arafura Rare Earths presents at the Asian Rare Earths Conference, highlighting the Nolans Project as a construction-ready, scalable solution to the looming NdPr supply deficit.
Capital raise
 

ASX
444 days, 8 hours ago 
ARU
Arafura Rare Earths LTD
Arafura announces executive leadership changes
Arafura Rare Earths announces key executive leadership appointments, including a new Chief Operating Officer, Head of Corporate Affairs and Investor Relations, and Head of Sustainability and Environment, as the company progresses towards delivering the Nolans Project.

ASX
451 days, 12 hours ago 
ARU
Arafura Rare Earths LTD
Appointment of Non-Executive Directors
Arafura Rare Earths strengthens its board with the appointment of Dr. Roger Higgins and Mr. Michael Spreadborough as Independent Non-Executive Directors, effective April 8, 2024.

ASX
466 days, 3 hours ago 
ARU
Arafura Rare Earths LTD
Mineral Sands and Rare Earths Conference Presentation
TODO: excerpt

ASX
472 days, 6 hours ago 
ARU
Arafura Rare Earths LTD
Trading Halt
Arafura Rare Earths Ltd (ASX: ARU) has requested a trading halt pending an announcement regarding debt financing support.

ASX
472 days, 7 hours ago 
ARU
Arafura Rare Earths LTD
Pause in Trade
Trading of Arafura Rare Earths Ltd securities has been temporarily paused pending a further announcement.

ARU 
Arafura Rare Earths LTD 
ASX

Quarterly Activities Report and Appendix 5B

Sentiment:
 Quarterly Activities Report
 29 January 2025 4:20 PM

Arafura Rare Earths progresses funding for Nolans Project, secures A$200 million investment, and targets final investment decision by mid-2025.

Delay expected
  The gas supply agreement condition precedent date has been extended to 4 February 2025, with potential for further extension. 

Capital raise
  The company is engaging with other potential cornerstone investors to secure the remaining equity required for the project.  The A$200 million investment from the NRFC is expected to be a catalyst for attracting additional equity funding. 

Summary
  • Arafura Rare Earths focused on advancing the Nolans Project during the fourth quarter of 2024, with a key emphasis on securing funding and reducing project risks.
  • The company received a A$200 million investment commitment from the National Reconstruction Fund Corporation (NRFC) after the quarter ended.
  • This investment is structured as convertible notes with a 15-year term and a 7-year conversion period, and is expected to attract further investment.
  • Arafura is targeting a final investment decision (FID) by the end of the first half of CY2025, contingent on investor due diligence and market conditions.
  • The company continued to work on engineering design, procurement, and construction planning for the Nolans Project.
  • A new Chief Projects Officer, Tommie van der Walt, was appointed to enhance project delivery expertise.
  • The company released its third sustainability report, highlighting its commitment to environmental and social responsibility.
  • The price of NdPr oxide was $54.60 per kilogram at the end of the quarter, with the market impacted by overcapacity.
  • Arafura has secured offtake agreements representing 58% of its target volume and is in discussions for the remaining amount.
  • The company has secured debt facilities totaling US$1.055 billion, including senior and subordinated debt.
  • Arafura's cash reserves were A$45 million as of December 31, 2024, with monthly cash outflows averaging A$3.3 million.
Sentiment

Score: 7

Explanation: The document is generally positive, highlighting significant progress in funding and project development. However, there are some risks and uncertainties related to market conditions and securing remaining funding and offtake agreements. The sentiment is positive but cautious.

Positives
  • The A$200 million investment from the NRFC significantly reduces the equity required for the Nolans Project.
  • The NRFC investment is expected to act as a catalyst for attracting other cornerstone investors.
  • The appointment of Tommie van der Walt as Chief Projects Officer brings valuable project delivery expertise.
  • The company is making progress on securing offtake agreements, with 58% of the target volume already secured.
  • Arafura has secured significant debt facilities, demonstrating the geostrategic importance of the Nolans Project.
  • The company is actively working to de-risk the project and optimize capital costs and schedule.
  • Arafura is recognized as a Materials Security Partnership (MSP) initiative, highlighting the geopolitical importance of the project.
Negatives
  • The final investment decision (FID) is contingent on potential cornerstone investors' internal processes, due diligence, and broader market conditions.
  • The NdPr market is currently impacted by overcapacity, with producers holding onto inventory rather than selling at lower prices.
  • The company is still in discussions to secure the remaining offtake agreements.
  • The gas supply agreement condition precedent date has been extended to 4 February 2025, with potential for further extension.
  • The company is awaiting final feedback and approval of the Mine Management Plan (MMP).
Risks
  • The final investment decision (FID) is subject to external factors such as investor due diligence and market conditions.
  • The NdPr market is currently experiencing overcapacity, which could impact pricing and profitability.
  • There is a risk of further delays in securing the gas supply agreement.
  • The company is still working to secure the remaining offtake agreements, which is crucial for project viability.
  • Potential policy and trade decisions by a second Trump Administration could impact the global rare earths market.
  • The project schedule is contingent on securing funding, completing construction, and commissioning, as well as general market conditions.
Future Outlook

Arafura is targeting a final investment decision (FID) by the end of the first half of CY2025, contingent on investor due diligence and market conditions. The company will update the market should there be a material change, including details of any material financial impact on the Project.

Management Comments
  • Arafura's Managing Director Darryl Cuzzubbo said, 'This commitment not only reduces the total equity required, but it reflects the interests of current shareholders whilst attracting new investors.'
  • Darryl Cuzzubbo also stated, 'We are engaging with other potential cornerstone investors to advance discussions in securing the equity required to move the project forward.'
Industry Context

The announcement highlights the increasing global focus on securing diversified rare earths supply chains outside of China, with Arafura's Nolans Project being recognized as a key solution. The Materials Security Partnership (MSP) acknowledgement underscores the geopolitical importance of the project. The growth in EV sales in Europe and the US also highlights the increasing demand for NdPr, a key component in EV magnets.

Comparison to Industry Standards
  • The A$200 million investment from the NRFC is a significant commitment, comparable to other government-backed investments in critical minerals projects globally.
  • The debt facilities secured by Arafura, totaling US$1.055 billion, are substantial and demonstrate strong lender confidence in the project, similar to other large-scale mining projects.
  • The offtake agreements secured by Arafura, representing 58% of the target volume, are in line with industry standards for securing project financing and demonstrating market demand.
  • The company's focus on sustainability and environmental responsibility aligns with increasing global standards for mining projects, similar to other projects seeking international funding and partnerships.
  • The targeted FID by mid-2025 is a common timeline for projects of this scale, although it is subject to market conditions and investor due diligence, which is typical for the industry.
Stakeholder Impact
  • Shareholders will benefit from the reduced equity requirement and the potential for increased value due to the NRFC investment.
  • Employees will see increased job security as the project progresses towards FID and construction.
  • Customers will have a more secure and diversified supply of rare earths, which is crucial for their own supply chains.
  • Suppliers will have opportunities to provide goods and services to the project as it moves forward.
  • Creditors will have increased confidence in the project due to the secured debt facilities and the NRFC investment.
Next Steps
  • Continue discussions with potential cornerstone investors to secure the remaining equity funding.
  • Finalize the gas supply agreement and secure long-term supply options.
  • Complete the final revision and submission of the Radiation Protection and Waste Management Plan.
  • Progress the Mine Management Plan (MMP) for final feedback and approval.
  • Continue to work on engineering design, procurement, and construction planning.
  • Prepare for the initial Systems Verification Audit (SVA) for Workplace, Health and Safety Accreditation in February 2025.
  • Work towards a final investment decision (FID) by the end of the first half of CY2025.
Key Dates
  • 2024-10: Initial application for Workplace, Health and Safety Accreditation was accepted.
  • 2024-12-20: Condition precedent date for the gas supply agreement was extended.
  • 2024-12-31: End of the reporting quarter, Arafura had cash reserves of A$45m.
  • 2025-01-15: A$200 million investment commitment from the NRFC was announced.
  • 2025-01-20: Tommie van der Walt commenced as Chief Projects Officer.
  • 2025-02-04: Extended condition precedent date for the gas supply agreement.
  • 2025-02: Initial Systems Verification Audit (SVA) for Workplace, Health and Safety Accreditation is scheduled.
Keywords
Rare Earths, Nolans Project, Funding, Investment, Offtake, NdPr, Critical Minerals, Sustainability, Project Development, Convertible Notes

ARU 
Arafura Rare Earths LTD 
ASX
Sector: Materials
 
Filings with Classifications
Delay expected
20 May 2025 12:10 AM

Conference Presentation
  • The sources and uses of funds section includes an increase in ramp-up period from 2 years to 3 years and a 3-month delay in first production.
Capital raise
20 May 2025 12:10 AM

Conference Presentation
  • The company requires a new equity requirement of US$793m (including COF).
  • Less NRFC US$133m (A$200m).
  • Remaining new equity requirement of US$660m.
Capital raise
29 April 2025 6:47 PM

Quarterly Activities Report and Appendix 5B
  • Arafura is assessing a potential joint venture (JV) structure which could significantly reduce the equity required to fund Arafura's remaining project interest.
  • The company and its advisors regularly consider and assess options put forward by third parties (including potential corporate and project-level transactions) which could, if implemented, give rise to an alternative pathway to the funding and development of the Project for the benefit of shareholders.
Delay expected
29 April 2025 6:47 PM

Quarterly Activities Report and Appendix 5B
  • The final investment decision for Nolans has the potential to extend beyond the previously advised window of the first half of 2025 calendar year due to the assessment of a potential joint venture structure.
Capital raise
4 March 2025 4:21 PM

Investor Presentation
  • The company plans to raise equity through industry cornerstones, institutional investors, and an offer to new and existing shareholders.
  • The equity raise is intended to fund the US$1.2 billion Nolans Project.
Better than expected
19 February 2025 12:53 AM

Interim Financial Report
  • The net loss decreased compared to the previous year (A$18.85 million vs A$66.87 million).
Capital raise
19 February 2025 12:53 AM

Interim Financial Report
  • Arafura signed a binding term sheet with the NRFC for a A$200 million investment through unsecured convertible notes.
  • The company may seek additional equity to reduce the amount of funding being sought through public raising.
Delay expected
31 January 2025 12:53 AM

Update to Agreement
  • The gas supply agreement deadline has been extended from February 4, 2025, to March 31, 2025.
Capital raise
29 January 2025 4:20 PM

Quarterly Activities Report
  • The company is engaging with other potential cornerstone investors to secure the remaining equity required for the project.
  • The A$200 million investment from the NRFC is expected to be a catalyst for attracting additional equity funding.
Delay expected
29 January 2025 4:20 PM

Quarterly Activities Report
  • The gas supply agreement condition precedent date has been extended to 4 February 2025, with potential for further extension.
Capital raise
14 January 2025 4:23 PM

Funding Announcement
  • The convertible notes will convert into shares at a 40% premium to the reference price, which will be determined by a future equity raising.
  • The company expects to announce the equity financing around the time of the Final Investment Decision for the Nolans Project.
Delay expected
19 December 2024 5:36 PM

Project Update
  • The condition precedent date for the gas supply agreement has been extended from December 31, 2024, to February 4, 2025.
Delay expected
19 December 2024 3:30 PM

Operational Update
  • The condition precedent date for the gas supply agreement has been delayed from December 31, 2024, to February 4, 2025.
Delay expected
19 December 2024 3:53 AM

Operational Update
  • The condition precedent date for the gas supply agreement has been extended from December 31, 2024 to February 4, 2025.
Capital raise
2 December 2024 7:23 PM

Sustainability Report
  • A$20 million was received from sophisticated institutional investors.
  • An additional A$4.6 million was received from existing shareholders through a share purchase plan.
Capital raise
21 October 2024 4:00 AM

Revised Presentation
  • The company is seeking to raise the remaining equity funding through an offer to new and existing shareholders.
Capital raise
16 October 2024 9:27 PM

Annual Report Presentation
  • The company is seeking to raise the remaining equity funding needed to commence construction.
Capital raise
16 October 2024 9:24 PM

Annual Report
  • Arafura is actively seeking equity funding to reach a final investment decision on the Nolans Project.
Delay expected
16 October 2024 9:24 PM

Annual Report
  • While the company is making progress, the timeline for reaching a final investment decision has been extended due to the complexities of securing funding in a challenging market environment.
Capital raise
16 September 2024 2:10 AM

Annual Report
  • A $20 million institutional placement was completed.
  • A share purchase plan is targeting an additional $7 million, with potential for up to $3 million in oversubscriptions.
Capital raise
16 September 2024 2:04 AM

Annual General Meeting Notice
  • If all Placement Options are exercised, the Company will raise an additional $17,578,125 (before costs) to further progress the development of the Nolans Project and for general working capital purposes.
Capital raise
10 September 2024 6:18 PM

Share Purchase Plan Results
  • The SPP raised $4.6 million (before costs).
  • A previous placement raised $20 million.
Worse than expected
10 September 2024 6:18 PM

Share Purchase Plan Results
  • The SPP raised $4.6 million, which is less than the targeted $7 million.
Capital raise
5 September 2024 6:18 PM

Capital Raising Announcement
  • A$20 million placement completed in two tranches.
  • A$7 million target for the share purchase plan (SPP), with a potential for A$3 million in oversubscriptions.
Capital raise
3 September 2024 11:29 PM

General Meeting Results
  • Share issuance under Tranche 1 and Tranche 2 of a placement.
  • Share issuance under the SPP (including shortfall offer).
  • Share issuance to directors under the SPP.
Capital raise
2 August 2024 1:35 AM

Share Purchase Plan Announcement
  • Arafura Rare Earths is conducting a Share Purchase Plan (SPP) to raise A$7 million before costs.
  • The company may accept oversubscriptions up to A$3 million.
  • The SPP offer price is A$0.16 per new share.
Capital raise
1 August 2024 6:19 PM

Prospectus
  • The company may offer SPP Shortfall Shares to specific investors if the SPP does not reach its target of $7 million.
  • The company has conditional approval for US$775 million in senior debt facilities, an additional US$80 million for a cost overrun facility (COF) and a further US$200 million in the form of a standby liquidity facility (SLF).
Delay expected
28 July 2024 7:28 PM

Gas Sales Agreement Announcement
  • The condition precedent date of the Arafura GSA has been extended by five months to December 31, 2024.
  • The start date of the Arafura GSA has been deferred by two years to January 1, 2028.
  • The NGP is not expected to reopen until later this year.
Delay expected
28 July 2024 6:58 PM

Gas Sales Agreement Announcement
  • The Arafura GSA supply start date has been deferred by two years to January 1, 2028.
  • The Northern Gas Pipeline (NGP) is not expected to re-open until later this year.
Delay expected
28 July 2024 6:35 PM

Announcement and Media Release
  • The Arafura GSA has been amended, deferring the supply start date by two years to January 1, 2028.
Capital raise
28 July 2024 6:35 PM

Announcement and Media Release
  • The company will require further gas contracting and funding arrangements by Central to progress appraisal wells at Mereenie and Palm Valley.
Capital raise
23 July 2024 7:23 PM

Trading Halt Request
  • Arafura Rare Earths is completing the placement component of a capital raising.
  • The trading halt is pending an announcement regarding the completion of this placement.
Capital raise
22 July 2024 8:49 PM

Quarterly Activities Report
  • The company intends to execute a capital raising to secure the equity required for the project.
  • Barrenjoey has been appointed as a third joint lead manager alongside UBS AG and Canaccord Genuity to assist in raising the equity.
Delay expected
22 July 2024 6:12 PM

Investor Presentation
  • The sources and uses of funds includes adjustments for a 3-month delay in first production.
Capital raise
22 July 2024 6:12 PM

Project Funding Update
  • The company needs to raise new equity to meet the balance of the Projects funding requirement.
  • The COF equity component of US$80 million is targeted to be raised at the same time as the new equity.
Delay expected
22 July 2024 6:12 PM

Project Funding Update
  • The project includes an increase in ramp-up period (from 2 years to 3 years), and a 3-month delay in first production.
Capital raise
22 July 2024 6:12 PM

Investor Presentation
  • The company is focused on securing equity, leveraging strategic nature of NdPr.
  • The balance to be raised through offer to new and existing shareholders.
Capital raise
28 May 2024 9:00 PM

Conference Presentation
  • The company is planning a potential build-up of equity capital.
  • Customer/strategic commitment will drive participation of financial groups.
  • The balance to be raised through offer to new and existing shareholders.
Capital raise
28 April 2024 6:26 PM

Quarterly Activities Report
  • The company intends to execute a capital raising when debt financing with key credit approvals is in place.
  • The company is targeting a substantial portion of the equity requirement via cornerstone investors ahead of launching a public equity raising with institutions and retail investors.
Capital raise
22 April 2024 3:09 AM

Conference Presentation
  • The company is planning a potential build-up of equity capital.
  • The company has appointed Joint Lead Managers.
  • The company is seeking customer/strategic commitment to drive participation of financial groups.
  • The company is planning to raise capital through an offer to new and existing shareholders.

Disclaimer: This summary was generated by artificial intelligence and its accuracy is not guaranteed. The information provided here is for general informational purposes only and does not constitute financial advice, recommendation, or endorsement of any kind. It may contain errors or omissions. You should not rely on this information to make financial decisions. Always seek the advice of a qualified financial professional before making any investment or financial decisions. Use of this information is at your own risk.